Platform overview/Assistant
An intelligent project coworker.
Ask the whole project a question, draft the deliverable, and surface the answer from sources you can trust. Every answer carries the clause it came from.
Request a demoAssistant
6 of 38 systems exceed the mandatory threshold and must be tested. The governing basis is AS 4254.2 for high-pressure ductwork; the rest fall under DW/144.
Ask
Question the whole project in plain language.
Archie has read every specification, drawing, schedule, contract and model in the job. Ask what you need in plain language and get a direct answer, with the page and clause it came from attached.
- Answers cite the document, page and clause every time
- Reads specs, drawings, schedules, contracts and models
- Extraction gaps are surfaced, never quietly swallowed
Assistant
6 of 38 systems exceed the mandatory threshold and must be tested. The governing basis is AS 4254.2 for high-pressure ductwork; the rest fall under DW/144.
Act
Turn an answer into a deliverable.
An answer is a starting point. From the same box, build a schedule, open a review table across your documents, or run a workflow, and the result lands in your deliverables with its working.
- Start an action from the same place you ask
- Schedules, review tables and workflows, one step away
- Every output published with its provenance
Review table: test requirements
| Document | Requirement | Source |
|---|---|---|
| Spec, Sec 23 05 | 500 Pa | p.42 |
| Head contract | AS 4254.2 | p.11 |
| Addendum 3 | Class C seal | p.4 |
Cells are extracted verbatim, never computed, and stay unverified until a human confirms them.
Trust
Every answer shows its working.
Nothing is asserted without a source. Compliance values are computed by the deterministic engine and shown with the standard behind them, so an answer is something you can check, not something you have to take on faith.
- Numbers computed by the engine, never written by the AI
- The governing standard shown on every value
- Retrace any answer without asking who produced it
Evidence and calculation pack
Criteria and constants
Every constant versioned and verified against its source clause.
Quantity take-off audit
Every metre accounted for. Anything uncertain disclosed, not distributed.
Worked example: EAF-01
The full calculation, step by step, with the governing basis shown.
Ask Archie about your own project.
Bring a spec and a drawing set to the demo, and watch it answer questions you know the answers to.